Navigating the Permitting and Interconnection Process for Self-Installed Solar

July 17, 2024

Installing your own solar system at home can be an exciting and rewarding project, but it requires careful planning and adherence to various regulations. Understanding the permitting processes and interconnection applications is crucial for a smooth and compliant installation. Here's a comprehensive guide to help you navigate these steps effectively.

1. Understanding the Permitting Process

Before installing your solar system, you need to obtain several permits. These permits ensure that your installation meets all safety and building standards. Here are the primary governing bodies and what they typically require, though every county/state may require different things:

a. Local Building Department

  • What They Require: You will need a building permit from your local city or county building department. This involves submitting detailed plans of your solar installation, including the location of panels, wiring diagrams, and structural load calculations.
  • Variations: Requirements can vary significantly. Some areas might require a professional engineer’s approval, while others may have specific zoning laws regarding the visibility and placement of solar panels.

b. Electrical Inspector

  • What They Require: An electrical permit is usually required, which involves an inspection to ensure that the electrical components of your solar system comply with the National Electrical Code (NEC).
  • Variations: Inspection criteria can vary based on local amendments to the NEC. Some regions may have additional safety requirements or specific installation practices.

c. Planning and Zoning Department

  • What They Require: This department ensures that your solar installation complies with local zoning laws, which may include restrictions on panel placement, size, and visibility from the street.
  • Variations: Urban areas may have stricter regulations compared to rural areas. Historical districts or homeowner associations (HOAs) might have additional aesthetic or structural guidelines.

2. The Interconnection Application

Once your permits are in order, the next step is to connect your solar system to the electrical grid. This process is known as interconnection and involves coordination with your utility company.

a. Utility Company

  • What They Require: You will need to submit an interconnection application to your utility company. This application includes technical details of your solar system, such as the inverter type, system size, and safety features. (DIY Solar will help you get all this information by taking care of the engineering and design of your system!)
  • Variations: Each utility has its own interconnection standards and timelines. Some may require additional equipment, like a separate utility meter or specific disconnect switches.

b. Net Metering Agreement

  • What They Require: If you plan to take advantage of net metering, you will need to enter into a net metering agreement with your utility. This agreement allows you to receive credits for excess electricity generated by your solar system.
  • Variations: Net metering policies vary by state and utility. Some utilities offer full retail rate credits, while others may offer lower rates or impose limits on the amount of electricity that can be credited.

3. Potential Challenges and Tips

The permitting and interconnection process can be complex, with each governing body and utility company having its own set of rules. Here are some tips to help you navigate these challenges:

  • Research Local Requirements: Start by researching the specific requirements of your local building department, electrical inspector, and planning and zoning department. Understanding these upfront can save time and prevent costly delays.
  • Consult with Professionals: Working with a company like DIY Solar will help you run through this process smoothly.
  • Stay Organized: Keep detailed records of all applications, permits, and communications with regulatory bodies and utility companies. This can help streamline the process and provide a reference in case of disputes.
  • Plan for Inspections: Schedule inspections at convenient times and be prepared for potential re-inspections if any issues are found.

Conclusion

Installing your own solar system is a rewarding endeavor, but it requires careful navigation of the permitting and interconnection processes. By understanding the requirements of local governing bodies and utility companies, and by staying organized and informed, you can successfully complete your self-installed solar project and enjoy the benefits of renewable energy.

For more detailed guidance and specific information related to your area, get on a call with us today! We're here to help DIY'ers like you.

Fill out the form!

We will text you soon.

FREE Lion Prowler Power Bank

$49 Value
Lion Energy Prowler Power Bank
When you pay your deposit within 5 days of receiving your quote.  (Learn more)

FREE Lion Summit Power Generator

$499 Value
When you pay in full within 30 days of making your deposit.  (Learn more)
GET MY QUOTE
Still have questions?
Spending 60 seconds to fill out the quoting form will answer many of your questions. But feel free to contact us in any case!
GET MY QUOTEContact Us